Intercept and variable | Prediction model | |||
---|---|---|---|---|
Odds ratio [95% CI] | Std. err | Z | P >|Z| | |
Cement leakage | 22.72399 [5.3446287,96.5866] | 16.78 | 4.23 | < 0.001 |
Bone cement diffusion | 0.1108337 [0.0278436,0.4411833] | 0.08 | − 3.12 | 0.002 |
Endplate fracture | 52.63849 [12.51557,221.3891] | 38.58 | 5.41 | < 0.001 |
Cons | 0.0647761 [0.0131643,0.3187363] | 0.05 | − 3.37 | 0.001 |