PKP (n = 122) | PMCP (n = 134) | t (χ2) | p | |
---|---|---|---|---|
Operation time (min) | 33.11 ± 3.65 | 33.69 ± 3.30 | t = − 1.333 | 0.184 |
Hospital stays (days) | 6.64 ± 3.02 | 7.20 ± 3.35 | t = 1.406 | 0.161 |
Cost (dollar) | 3697 ± 461 | 5255 ± 262 | t = 33.600 | < 0.001 |
Volume of cement(ml) | 6.19 ± 1.27 | 6.42 ± 1.39 | t = 1.399 | 0.163 |
Blood loss(ml) | 5.82 ± 1.86 | 5.90 ± 1.92 | t = 0.320 | 0.749 |
Cement leakage | 35/122 | 23/134 | χ2 = 4.840 | 0.028 |