| Group TPRPA | Group CTPA | Statistics | P |
---|---|---|---|---|
VAS | ||||
 Preoperative | 5.79 ± 0.70 | 5.82 ± 0.67 | t = − 0.209 | 0.835 |
 Postoperative 2 days | 2.79 ± 0.96 | 2.59 ± 0.99 | t = 0.874 | 0.385 |
 Postoperative 12 months | 0.92 ± 0.85 | 0.94 ± 0.85 | t = − 0.100 | 0.920 |
ODI | ||||
 Preoperative | 79.30 ± 10.40 | 78.04 ± 9.80 | t = 0.527 | 0.600 |
 Postoperative 2 days | 35.26 ± 3.53 | 35.21 ± 3.28 | t = 0.064 | 0.949 |
 Postoperative 12 months | 16.45 ± 5.89 | 16.47 ± 5.84 | t = − 0.017 | 0.987 |
 Bone cement leakage | 8(21.05%) | 11(32.35%) | χ2 = 1.180 | 0.277 |
Distribution types | ||||
 T1 | 26 (68.42%) | 15(44.12%) | χ2 = 4.323 | 0.038 |
 T2 | 12 | 19 |  |  |
Recovery height of injured vertebra (mm) | 3.16 ± 1.76 | 2.53 ± 1.74 | t = 1.529 | 0.131 |
Lost height of injured vertebra (mm) | 0.66 ± 0.67 | 1.03 ± 0.76 | t = − 2.227 | 0.029 |