Figure 4From: Modified femoral pressuriser generates a longer lasting high pressure during cement pressurisationThe mean durations of the different pressures generated in the femoral canal with modified (blue lines) and conventional pressurisers (red lines) at positions 1 and 2. M-P-1 = Modified position 1 - Proximal. M-P-2 = Modified position 2 - Distal. C-P-1 = Conventional position 1 - Proximal. C-P-2 = Conventional position 2 - DistalBack to article page